Socio-Economic Baseline Survey of 12 VDCs of Lalitpur District (Completed October 2003)

Start Date: August 2003

End Date: October 2003

Location: Lalitpur

Donor(s): World Vision Nepal

Budget: NRs. 320,500.00 (US$ 4,514.08)

This project entailed the creation of a baseline survey for 12 different VDCs within the Lalitpur district. The project also led to the construction of four water supply schemes, four drinking water schemes with 64 water points, and the renovation of 14 existing drinking water schemes. Roughly 200 toilets were also constructed for low-income families. It was calculated that 480 households and 1432 people benefitted from the project.